M.S. Concrete and Metal Works
Friday, July 18, 2014
GAF Tank Farm ISO 3
This footing was 18" thick, almost 300 cubic yards, 32,000 lbs of reinforcing.
GAF Silo Pad
Almost 400 Cubic Yards of Concrete, and over 30,000 lbs of steel. Thanks to Bundy Steel for providing the rebar through Western States Rebar and for tying all the bar.
Newer Posts
Older Posts
Home
Subscribe to:
Posts (Atom)