Tuesday, February 26, 2013




This project was completed in 2011 in Washington City, Utah.  The project name is Sullivan Park.  Sunroc Construction subcontracted with us to complete the curb and gutter, sidewalks, walkways, waterways, overflows, and ADA ramps.


This project was built on the campus of Southern Utah University under the director of Carter Enterprises as General Contractor.  The DFCM was the project administrator.  Ben Johnson was the representative from SUU.  The retaining walls had a form liner pattern to give a look of rough cut lumber.  They were also colored and had fibermesh installed at a rate of 3lbs per cubic yard.  Tyler Allred with Allred and Allred helped with the retaining wall construction.  The walls heights varied from 4' to 12'.  With over 100 steps on the project and ADA compliant ramps linking the two main walkways, it was a challenge to design and build.  Some modifications had to be made during construction to make everything fit. Joel Andrus represented Bowen & Collins as the Design Engineers.