M.S. Concrete and Metal Works
Tuesday, October 8, 2013
Santa Clara Dam
Sunroc Construction was the General Contractor. This project involved constructing a headwall after the outflow pipe was encased in concrete. These structures would ultimately be at the bottom of the dam.
Newer Posts
Older Posts
Home
Subscribe to:
Posts (Atom)