Sunroc Construction was the General Contractor. This project involved constructing a headwall after the outflow pipe was encased in concrete. These structures would ultimately be at the bottom of the dam.
Tuesday, October 8, 2013
Tuesday, February 26, 2013

Subscribe to:
Posts (Atom)