M.S. Concrete and Metal Works
Wednesday, October 12, 2011
Telegraph Reconstruction
Interstate Rock was the General Contractor on this project. This project widened the bottle neck through Washington City into four total lanes. We did the curb and gutter, sidewalk, driveway's, median curbs, ADA ramps, and stamped median filler.
Newer Posts
Older Posts
Home
Subscribe to:
Posts (Atom)