3 Peaks Substation - Control House & Transformer Pad
M.S. poured the footings and flatwork and Allred and Allred setup the walls. This was not the typical job as it was for the main controls of a substation. Many wall penetrations and embeds were installed to facilitate all the wiring.
Gomaco GT 3600