Friday, July 18, 2014

GAF Tank Farm ISO 3






This footing was 18" thick, almost 300 cubic yards, 32,000 lbs of reinforcing.

GAF Silo Pad




Almost 400 Cubic Yards of Concrete, and over 30,000 lbs of steel.  Thanks to Bundy Steel for providing the rebar through Western States Rebar and for tying all the bar.

Tuesday, October 8, 2013

Santa Clara Dam

Sunroc Construction was the General Contractor.  This project involved constructing a headwall after the outflow pipe was encased in concrete.  These structures would ultimately be at the bottom of the dam.










Tuesday, February 26, 2013




This project was completed in 2011 in Washington City, Utah.  The project name is Sullivan Park.  Sunroc Construction subcontracted with us to complete the curb and gutter, sidewalks, walkways, waterways, overflows, and ADA ramps.


This project was built on the campus of Southern Utah University under the director of Carter Enterprises as General Contractor.  The DFCM was the project administrator.  Ben Johnson was the representative from SUU.  The retaining walls had a form liner pattern to give a look of rough cut lumber.  They were also colored and had fibermesh installed at a rate of 3lbs per cubic yard.  Tyler Allred with Allred and Allred helped with the retaining wall construction.  The walls heights varied from 4' to 12'.  With over 100 steps on the project and ADA compliant ramps linking the two main walkways, it was a challenge to design and build.  Some modifications had to be made during construction to make everything fit. Joel Andrus represented Bowen & Collins as the Design Engineers.












Wednesday, October 12, 2011

Telegraph Reconstruction



Interstate Rock was the General Contractor on this project. This project widened the bottle neck through Washington City into four total lanes. We did the curb and gutter, sidewalk, driveway's, median curbs, ADA ramps, and stamped median filler.

Tuesday, December 14, 2010

Friday, December 4, 2009

Blundell Geothermal Rock Muffler
























































This project is located northeast of Milford, UT. It is a patented design by Veizades Associates out of San Francisco to control the pressure released when the plant shuts down. Dailey Builders constructed the walls and floor and we did the Base slab and installation of baffles.